In this guide
- Compare delivered water at the same duty
- Distinguish installed, duty and reserve area
- Calculate gross flux from the production interval
- Build net output from time and volume
- Relate air demand to an operating mode
- Check blower duty and distribution together
- Measure specific energy across a stated boundary
- Use adverse feed and low temperature as design cases
- Evaluate turndown and reserve operation
- Compare air strategies with a worked duty schedule
- Put the comparison in an acceptance schedule
Compare delivered water at the same duty
To compare immersed UF flux and air scour, put every offer on the same feed, temperature, operating cycle and net-delivery basis. Then review the membrane area in service, air demand through the cycle and the electrical boundary. A quoted filtration flux and a blower rating leave useful production and running cost unresolved until those conditions are defined.
This guide supports preliminary design and tender comparison for immersed ultrafiltration. HOSON LGJ1 and LGJ2C assemblies provide different configurations for evaluation. The selected model needs an approved air and hydraulic design. All worked values in this article are hypothetical. They show how to interrogate a proposal and should be replaced with feed-specific design or pilot results before the owner makes an equipment commitment.
Distinguish installed, duty and reserve area
Installed membrane area is the area physically supplied. Duty area is the portion used for the operating case being assessed. Reserve area may be isolated, held available or rotated into service. Ask the bidder to report these separately for ordinary duty and one-train maintenance. Confirm how an unavailable module changes the controller's active-area calculation.
HOSON's public LGJ1 sheet lists 1,612 m² and 1,980 m² for its two named configurations. The LGJ2C-2000X140 listing describes a 140-element assembly. Keep these catalog identities with the quotation. The effective area, arrangement and interfaces used in a project calculation must correspond to the offered configuration.
Require the same area basis in flux, air-intensity and replacement-cost comparisons. Otherwise two offers can seem similar because each divides by a different quantity of membrane, even though their duty and reserve arrangements differ.
Calculate gross flux from the production interval
Gross filtration flux is production flow divided by active membrane area during the filtration step. Express flow and area in consistent units. With flow in cubic meters per hour and flux in liters per square meter per hour, multiply flow by 1,000 before dividing by area. Record the point in the sequence at which the flow is measured.
For a hypothetical duty area of 2,000 m² producing 100 m³/h during filtration, gross flux is 50 L/m²/h. If one of four equal cassettes is isolated while the same production flow is maintained, duty area falls to 1,500 m² and gross flux rises to about 66.7 L/m²/h. That change needs process review even though total installed area has stayed the same.
Ask for predicted performance at the actual duty flux in each availability case. The largest installed area figure alone cannot establish the required duty or operating margin.
Build net output from time and volume
Write a full sequence with filtration, relaxation, backwash and any other normal intervals. Identify water taken from the filtrate side and where it leaves the process. Calculate output across elapsed time, including the non-producing portions. If a bid already reports net output, obtain the calculation so internal consumption is deducted once.
In a hypothetical one-hour assessment, assume the example system filters at 100 m³/h for 50 minutes and spends 10 minutes in non-producing steps. Gross filtrate is about 83.3 m³. If 3.3 m³ of product water is used internally during that hour, net delivery is 80 m³. Spread across the 2,000 m² duty area and full hour, net flux is 40 L/m²/h.
Add longer cleaning and integrity-test interruptions to the daily or monthly duty schedule. A one-hour balance describes one operating cycle and leaves infrequent downtime to be evaluated separately.
| Hypothetical production measure | Result |
|---|---|
| Gross filtration flow | 100 m³/h |
| Gross filtration flux on 2,000 m² | 50 L/m²/h |
| Filtration time in one elapsed hour | 50 minutes |
| Net hourly delivery after 3.3 m³ internal use | 80 m³ |
| Net flux over the full hour | 40 L/m²/h |
Relate air demand to an operating mode
Request an air schedule that identifies the flow and pressure during each step, the number of racks supplied and the duration of each event. Confirm whether a quoted airflow is at actual conditions or a defined standard reference. Keep the reference temperature and pressure with the units so the blower supplier can interpret the duty.
An instantaneous air demand determines the equipment needed while a step is active. A time-averaged air demand helps describe consumption across the sequence. Both can be relevant, and they should be labeled. Ask how the system changes the air pattern when one rack is isolated or when the plant operates at reduced water output.
For offers using different air strategies, compare their approved sequences and resulting net production. A lower average air number needs evidence of sustainable operation under the specified feed conditions. Keep operating assumptions visible in the bid evaluation.
Check blower duty and distribution together
Map the shared air header from blower to each cassette. Identify pressure losses, control valves, flow measurement and isolation. Request the pressure required at the assembly inlet for the approved pattern. Check the blower's operating range when the smallest and largest permitted number of racks is active.
Consider a hypothetical system with four bays that requires air in two bays simultaneously during a defined cycle. Size the review around that simultaneous requirement and the agreed maintenance case. If one blower is unavailable, establish whether the remaining equipment can maintain the approved sequence or whether water production must change.
Record how the system confirms actual air delivery. A timer can command a valve while an obstruction or failed actuator changes the delivered flow. Include distribution checks in commissioning and preserve the baseline readings at representative bay levels and operating states.
Measure specific energy across a stated boundary
Use electrical energy consumed over a defined period divided by compliant net water delivered during the same period. Identify the equipment inside the measurement boundary. For a membrane-stage comparison, that might include filtrate pumps, blowers, backwash equipment and the allocated cleaning duty. Whole-plant figures may also include intake, pretreatment and final pumping.
Suppose a hypothetical membrane stage consumes 96 kWh while delivering 240 m³ over an agreed test period. Its measured specific energy for that boundary is 0.40 kWh/m³. If the quoted volume were gross filtrate rather than delivered water, the result would describe a different boundary. Keep the meter readings, volume totalizer values and operating states with the calculation.
Nameplate motor power helps select electrical infrastructure. It does not measure energy consumed over the test. Ask bidders to distinguish installed power, predicted running demand and the acceptance metric the owner will measure.
Use adverse feed and low temperature as design cases
Provide the supplier with the feed history and identify representative difficult periods. Set a low-temperature duty case if it is relevant to the source. Include prolonged changes in turbidity or organics and any known pretreatment upset. Ask for the operating response, allowed duration and effect on net production for each case.
Choose pilot measurements that answer a selection question. Track cycle-start and cycle-end pressure, useful output, cleaning recovery and air operation under a representative duty. Ask whether the result supports the proposed working flux or whether the design needs more area or different conditioning. A pilot is most effective when the decision it will inform is agreed before testing.
Separate accepted performance from extrapolation. Identify the feed conditions actually tested and the margin proposed for conditions outside that record. This gives procurement a clear list of assumptions to resolve with the designer.
Evaluate turndown and reserve operation
At reduced demand, the plant may rotate bays, reduce flow or alter the approved sequence. Ask the vendor how it preserves air distribution, minimum equipment operating conditions and representative monitoring. Confirm that calculations of flux and energy use the actual active area and net output in this mode.
Review the consequences of reserve capacity. A spare cassette held in service-ready condition may need routine operation or preservation. A duty-standby blower has its own start and changeover test. Include these activities in the operating plan and annual cost model.
Compare a planned cleaning outage with an unplanned quality event. They can remove the same membrane area while requiring different isolation, tank use or operator response. The accepted design should state what output remains available and what action the owner takes if the reserve is already in use.
Compare air strategies with a worked duty schedule
Use a time schedule to expose how air strategies differ before comparing annual cost. In a hypothetical first offer, an air step requires 600 Nm³/h for 10 minutes during each operating hour. Its hourly average is 100 Nm³/h across that schedule. A hypothetical second offer uses 240 Nm³/h for 30 minutes, averaging 120 Nm³/h. Both calculations assume identical reference conditions for the stated normal-volume unit.
The first offer has a lower average in this example and a higher instantaneous flow. That difference changes the blower and header review. It does not by itself establish which system consumes less electrical energy, because pressure, blower efficiency, unloaded operation and other demands also matter. Request the equipment duty points and measured or projected energy for the complete schedule.
Next compare the net water delivered during the same period. If the two sequences produce different useful volumes, divide their measured electrical energy by their own accepted net volumes and compare under a common feed duty. Include the time and energy allocated to cleaning events across the agreed assessment period.
Finally, test whether the proposed strategy operates with the required number of trains available. A pattern that works with all bays active may leave a shared blower outside its approved range when only one bay runs. Ask the vendor to identify the permitted modes and any resulting production restriction so the owner can include that behavior in its operating plan.
Put the comparison in an acceptance schedule
Prepare a common table for feed conditions, duty area, gross flow, full-cycle net flow, air schedule, pressure and electrical boundary. Add reserve operation, expected cleaning interruptions and the measurements used for acceptance. Ask every supplier to identify exceptions against the same table. Carry the accepted values into the test plan and control narrative.
During commissioning, match air and water totalizers to the same timestamps. Verify valve states, active module count and interruptions. Keep raw records so the owner can reproduce the net-output and specific-energy results. A clear boundary also makes subsequent changes in operation easier to evaluate.
Send HOSON the feed profile, required delivery schedule and bay arrangement when requesting an immersed UF proposal. Ask for a duty-specific LGJ1 or LGJ2C comparison with cycle calculations and an air-interface drawing that the blower supplier can review.